RCC foundation & RCC framed structure.
RCC Framed structure with earthquake resistant foundation.
Solid cement concrete blocks for both External and Internal walls.
Internal & External Walls: Double coat cement plaster with smooth finish.
Designer hardware with smart lock.
MAIN DOOR
Factory made solid/engineered wood frame, solid core shutter with teak veneer on both sides, finished with PU coat.
INTERNAL DOORS:
Factory made solid/engineered wood frame, solid core shutter 8’ ft height with veneer on both sides with PU coat.
EXTERNAL - Textured/smooth finish & two coats of exterior emulsion paint with exterior cladding as per architectural features.
MAIN FLOORING
DRAWING & LIVING ROOM
Imported marble flooring/skirting as per design.
LOBBY, HOME THEATER & DINING
Glazed vitrified tile flooring/skirting as per design.
ALL BEDROOMS, WALK INS, POOJA ROOM & KITCHEN
Glazed vitrified tile flooring/skirting as per design.
BALCONY & SIT OUTS
Vitrified tiles in wooden matte finish as per design.
TOILETS & UTILITY FLOORING
Anti-skid ceramic tiles.
TOILETS & UTILITY DADOING
Glazed ceramic tiles for toilet wall, dado up to false ceiling as per design.
Ceramic tile dado for the utility
STAIRCASE
Granite flooring with SS steel handrail.
PARKING AND DRIVEWAY
Rough finished granite/pavers as per architects’ intent.
SWIMMING POOL DECK
Wooden finish vitrified tiles
WATER CONNECTIONS – Treated water supply with water meters. Provision for fixing RO system.
EXHAUSTS - Provision for chimney.
UTILITY/WASH - Washing machine/dishwasher provision.
Wash Basin with granite countertop.
Wall mounted WCs in all bathrooms.
3-way diverter in master bedroom (Shower, Spout & Hand Shower).
Single Lever Tap and Shower Mixer in other toilets (Shower & Spout).
All CP and sanitary fixtures of reputed brand.
Heat pump provision.
Internal distribution lines in the villa to be closed with box type encloser.
1000 litres PVC tank to be provided at terrace only for the backup.
Provision for internet / television / intercom.
Provision for lifts.
WTP: Treated water to be made available through exclusive water softening for domestic purpose in all units with water meters (Pneumatic System).
STP: A sewage treatment plant of adequate capacity as per norms to be provided inside the project. Treated sewage water to be used for the landscaping & flushing.
Municipal Water: Municipal water points to be provided to all units with water meters.
100% DG set back up prepaid energy meter for DG power & EB power billing system.
Security cabins at all entrances and exits with peripheral CCTV coverage.
CCTV at vantage points - Project entry/exit, sports areas, clubhouse entry/exit, clubhouse areas in parking as per consultant recommendation.
Access Control System (provision) for clubhouse, main entry/exit passages.
Boom barriers proposed.
BMS for electrical, gas & water consumption with prepaid meters to be provided (centralized billing).
Dedicated 3 car parking.
One EV charging point provision for each villa.
40 feet wide BT finish with landscape intent.